Monday, February 10, 2014

Clean Up

Part of the owner responsibilities is to clean up the property. We spent an afternoon sorting wood pieces. Some scraps we decided to keep, others were set aside for burning. We ended up burning late into the night because it took longer to burn than we had expected. The kids always love going out and working. It is fun to work as a family. A warm fire in the cold winter is nice too.








The kids called this piece the toothbrush. We kept putting it in the burn pile and Avi kept taking it out!






Sheeting the Roof

After a day of ice fishing we went up to the property to see how things were going.  Here is Mal enjoying the open space.




The next step in the process was to sheet the roof. It definitely started to look more like a house when the roof was sheeted. The sheeting was finished on December 30th.








Wednesday, January 29, 2014

Working Through the Holidays

Our construction manager sent us a day by day schedule of the build. It has been a great tool. They have stayed on schedule. It has been updated but the final inspection date hasn't changed so I am okay with the changes. When I looked at the schedule and saw that most of the framing was scheduled between Christmas and New Years, I didn't know how it would go. Well, it went great. They don't have a school teachers schedule! They had to work while we enjoyed two weeks off for the holidays. They started framing on December 23rd. It was nice to be on break and be able to go and see progress on a daily basis.




 
These are all the pictures from December 24th! 
It was a beautiful Christmas Eve. What a great Christmas present to see that walls were going up!

December 26th

 
December 28th





We knew the crane for the trusses was coming on the 28th. We went out at 11 and the workers told us that the crane was scheduled to be there at noon. We went back home and decided to go back out in a few hours. Well, a few hours was too long. We missed the entire thing. I really wanted to be there to watch it all go up. Oh well!

First Delivery

I was visiting with a friend one day and she said, "I think I saw part of your house drive by my house last night." I got really excited and had to go and check it out. When I got there, the framing crew was there to start working and the first load of lumber had been delivered. The second load was being delivered . The framing crew was a group of 6 that worked very efficiently. The first day they laid all the under flooring. The next day they framed the garage. Then we had to wait for the plumber to run his pipes. After he was finished we waited on the inspection of the underfloor before they could start framing the rest of the house.





When I went out, I introduced myself to the workers and told them I just wanted to take some pictures of the process. One of them told me he "charged" for photography. They were a happy group of guys. With six guys they worked pretty quickly. 

This was completed on December 12th.
This is how the house sat for quite a while. By the time the plumber did his part and the inspection was done, they didn't start the rest of the framing until the 23rd and 24th of December. Yes, they came out and worked half a day on Christmas Eve. 

Finishing the Foundation

It was just our luck that the timing of below freezing temperatures and the schedule  to get the house started came at the same time. We did have to wait a while for the footings to set before they could start the stem walls. The new forms were set on top of the footings and it was time to get the foundation finished.





Footings

On November 18th the forms were set to pour the footings. I actually made it up to the property while they were pouring them on the 21st. After it was poured I felt the footprint was pretty small. It looked really small to me. This house is bigger than any house we have ever lived in and it is one level. All the houses we have lived in have had two levels. I know we will have plenty of space, it just seemed small.



Getting Started

On November 14th we were finally able to sign all the loan paperwork to purchase our land and get the construction loan open. This was after months of surveys, waiting, paperwork, waiting, septic inspections, well drilling, pump installation, securing property/construction insurance and getting an address. It finally happened! We have bought and sold a few houses in our married life, but this time there was more paperwork than we had ever signed before.
 
We had to secure the building permit, get temporary power set up and meet with Adair for our Pre-Construction meeting. We have a friend that built an Adair home and told us what to expect at the pre-con meeting so we thought we had everything covered. We added a few lights in the great room, moved the furnace and water heater to the garage and added a man door on the garage. We left feeling great!

Now that we are in the process, we have learned a few things:

1. Make sure you look at ALL the options Adair offers. They have some great options we wish we would have known about before now. A few examples, french doors instead of sliding doors off the dining room and a single large basin sink instead of a double sink.

2. The mud room in our house is pretty small. After the house was all framed up we realized that the mud room was next to our master closet. The master closet is massive. We wish we would have moved the wall over 3 feet to make the closet smaller and the mud room bigger. From what I understand this would have been an option had we discussed it at the pre-con meeting. That would have been really nice.
Our Building Permit

Temporary Power




A picture of our final choices for cupboards, flooring and counter top at the pre-con meeting.
Adair Posted their sign at the Building Site.


A Hole in the Ground





It is kind of hard to see, but there is a hole in the ground.



The Land

I don't have any great pictures of what the property looked like before we started working on it. I do have a few that kind of show where we started. I have a picture of the south hillside and then a few pictures of the kids and Lee standing on the very highest point of the property. That high point has been cleared down 8 feet and now has a house sitting on it. This is where we started!
This is the south side of the hill top.

Lee looking over the property from the top.

After a day of work moving fence, the kids hanging out up top.

This is a picture after a little dirt had been moved. You can see where the ditch used to be and where we started
to cut down in order to have a large enough pad to build the house.