There is an irrigation ditch that runs through the property right where we want to build our house. The solution to this is to bury the pipe. This was not a quick or easy process. We had to work with the Irrigation District to get permission to move the ditch, then they had to engineer it, and order the materials.  This is the busy season for the irrigation district. They are making sure everything is ready for water to get turned on in a few weeks. So, we do the work ourselves or wait until after October when the water turns back off to have the irrigation district do the work. We opted to do the work ourselves. We thought it would be a one day job. It ended up being a three day job. We had to dig through the road twice so Nyssa Road District spent some time working with us as well. We had to close the road to days in a row. It was a lot of hours and not a very fun spring break, but when we have a new house in a few months we will be so excited we did the work.

Supplies:

440 Feet of 15 Inch PVC
220 Feet of 8 Inch PVC
Plus everything to put it all together. 

Since we would be digging we had to call 811 (call before you dig) to come out and mark any phone and power lines. Luckily we only had to worry about phone lines. They were marked in yellow on the roadside exactly above each line. We  had to dig with shovels until we found them.  We dug down about 3 feet for the first two holes. The last line was only about 8 inches in the ground!


Yellow Phone Line Marking

First Phone Line Found

Pipe Being Delivered

The First Dig From The Backhoe

Starting to Dig the Trench For The Pipe


This is Where the Pipe Starts

Small Break Down With Hydrolic Fluid Going Everywhere!

Further Down the Line

The Tunnel Going Under the Phone Line then Across the Road
There are two different land owners that receive water from the current ditch. We had to bury pipe for each of them. The pipe is buried 4 feet underground with a line going to each land owner. All the pipe is in the ground waiting for the Irrigation District to come and tie it into the current meter boxes. 